This final test measures the completed home’s air leakage performance and is typically used for code compliance, EnerGuide, Step Code, builder quality assurance or diagnostics.
How We Perform the Work:
We complete the blower door test once the home is substantially complete and ready for occupancy. For a home to be ready for final blower door testing the following conditions should be met:
- All windows and doors installed and can be closed (locked)
- Mechanical system in place and all vents and ducts connected/sealed to occupancy readiness
- Attic hatch is installed and treated with weather stripping (if applicable)
- Plumbing pipes and p-traps should be filled with water
- Air barrier assemblies are complete
The measured air leakage rate is documented for the required project purpose.
Scope of Work Includes:
- Final blower door test setup.
- Measurement of final air leakage performance.
- Documentation of test conditions and results.
- Preparation of submission-ready test data, where applicable.
- Final summary for the builder, owner, or project file.